|
3482 |
Bottling Plant for Packaged Drinking Water |
29/08/2013 |
05/08/2013 |
View |
|
3511 |
construction of temporary room for NMR facility for chemistry department between block No. V VI in academic area at IIT Delhi |
29/08/2013 |
16/08/2013 |
View |
|
3516 |
1-Providing and fixing false ceiling in MS-104 (2) Replacing old damaged PVC flooring with file flooring in WS-133 (3) Providing and fixing wall tiles in strong room (4) Providing and fixing MS iron grill in MS-901 |
29/08/2013 |
19/08/2013 |
View |
|
3514 |
UV Irradiator for Polymer Cross Linking |
28/08/2013 |
19/08/2013 |
View |
|
3534 |
Preparation of Concept maps, hard spots and a technology platform for teaching school mathematics from IX to XII |
26/08/2013 |
26/08/2013 |
View |
|
3480 |
Clean air Wet bench |
26/08/2013 |
05/08/2013 |
View |
|
3492 |
Dynamic Signal Analyser |
26/08/2013 |
06/08/2013 |
View |
|
3496 |
Liquid Helium Dewar |
26/08/2013 |
07/08/2013 |
View |
|
3504 |
Quotations are invited for the purchase of a branded multichannel Potentiostat/Galvanostat/FRA battery cycler |
26/08/2013 |
12/08/2013 |
View |
|
3460 |
Purchase of a Tensiometer |
23/08/2013 |
31/07/2013 |
View |
|
3467 |
Deep Freezer |
23/08/2013 |
01/08/2013 |
View |
|
3469 |
procurement of HPTLC |
21/08/2013 |
02/08/2013 |
View |
|
3493 |
Civil Work |
21/08/2013 |
06/08/2013 |
View |
|
3494 |
Construction of temporary Doctor’s Rooms and waiting hall at IIT Hospital at IIT Delhi |
21/08/2013 |
06/08/2013 |
View |
|
3512 |
A.R. M.O. Building in Academic Area at IIT Delhi (SubHead Job Works of up keeping Civil Maintenance in Academic Area at IIT Delhi) |
21/08/2013 |
16/08/2013 |
View |
|
3513 |
Replacing of old damage aluminium foil coated APP Membrane with new 1.50mm thick self-adhesive, elastromeric SBS bitumen-based water proofing membrane, for rectification of leakage over the roof of Dogra Hall in Academic Area at IITD |
21/08/2013 |
19/08/2013 |
View |
|
3479 |
Purchase of Flatbed cutting plotter with vacuum adhesion with appropriate vacuum system. |
20/08/2013 |
05/08/2013 |
View |
|
3483 |
Experimental Setup for Flow Control |
19/08/2013 |
05/08/2013 |
View |
|
3484 |
Experimental Setup for Control Valve Characteristics |
19/08/2013 |
05/08/2013 |
View |
|
3466 |
Climate Chamber |
16/08/2013 |
01/08/2013 |
View |
|
3470 |
40 KVA Online UPS System |
16/08/2013 |
02/08/2013 |
View |
|
3475 |
Experimental Setup for Interacting and Non-interacting System |
16/08/2013 |
05/08/2013 |
View |
|
3476 |
Experimental Setup for Time Constant of Thermocouple and Thermometer |
16/08/2013 |
05/08/2013 |
View |
|
3477 |
Experimental Setup for Time Constant of Manometer |
16/08/2013 |
05/08/2013 |
View |
|
3478 |
Experimental Setup for Level Measurement by Capacitance Method |
16/08/2013 |
05/08/2013 |
View |
|
3498 |
Corrigendum to Climate Chamber |
16/08/2013 |
07/08/2013 |
View |
|
3461 |
A split type high temperature Furnace for Fluidised Bed reactor system |
16/08/2013 |
31/07/2013 |
View |
|
3505 |
Purchasing of Printing Stationery for Admn. |
16/08/2013 |
12/08/2013 |
View |
|
3506 |
Purchasing of Stationery for Administration |
16/08/2013 |
12/08/2013 |
View |
|
3468 |
Purchase of Desktops |
14/08/2013 |
01/08/2013 |
View |