Tender Archives

NIT No. Title Last Date Upload On File
3482 Bottling Plant for Packaged Drinking Water 29/08/2013 05/08/2013 View
3511 construction of temporary room for NMR facility for chemistry department between block No. V VI in academic area at IIT Delhi 29/08/2013 16/08/2013 View
3516 1-Providing and fixing false ceiling in MS-104 (2) Replacing old damaged PVC flooring with file flooring in WS-133 (3) Providing and fixing wall tiles in strong room (4) Providing and fixing MS iron grill in MS-901 29/08/2013 19/08/2013 View
3514 UV Irradiator for Polymer Cross Linking 28/08/2013 19/08/2013 View
3534 Preparation of Concept maps, hard spots and a technology platform for teaching school mathematics from IX to XII 26/08/2013 26/08/2013 View
3480 Clean air Wet bench 26/08/2013 05/08/2013 View
3492 Dynamic Signal Analyser 26/08/2013 06/08/2013 View
3496 Liquid Helium Dewar 26/08/2013 07/08/2013 View
3504 Quotations are invited for the purchase of a branded multichannel Potentiostat/Galvanostat/FRA battery cycler 26/08/2013 12/08/2013 View
3460 Purchase of a Tensiometer 23/08/2013 31/07/2013 View
3467 Deep Freezer 23/08/2013 01/08/2013 View
3469 procurement of HPTLC 21/08/2013 02/08/2013 View
3493 Civil Work 21/08/2013 06/08/2013 View
3494 Construction of temporary Doctor’s Rooms and waiting hall at IIT Hospital at IIT Delhi 21/08/2013 06/08/2013 View
3512 A.R. M.O. Building in Academic Area at IIT Delhi (SubHead Job Works of up keeping Civil Maintenance in Academic Area at IIT Delhi) 21/08/2013 16/08/2013 View
3513 Replacing of old damage aluminium foil coated APP Membrane with new 1.50mm thick self-adhesive, elastromeric SBS bitumen-based water proofing membrane, for rectification of leakage over the roof of Dogra Hall in Academic Area at IITD 21/08/2013 19/08/2013 View
3479 Purchase of Flatbed cutting plotter with vacuum adhesion with appropriate vacuum system. 20/08/2013 05/08/2013 View
3483 Experimental Setup for Flow Control 19/08/2013 05/08/2013 View
3484 Experimental Setup for Control Valve Characteristics 19/08/2013 05/08/2013 View
3466 Climate Chamber 16/08/2013 01/08/2013 View
3470 40 KVA Online UPS System 16/08/2013 02/08/2013 View
3475 Experimental Setup for Interacting and Non-interacting System 16/08/2013 05/08/2013 View
3476 Experimental Setup for Time Constant of Thermocouple and Thermometer 16/08/2013 05/08/2013 View
3477 Experimental Setup for Time Constant of Manometer 16/08/2013 05/08/2013 View
3478 Experimental Setup for Level Measurement by Capacitance Method 16/08/2013 05/08/2013 View
3498 Corrigendum to Climate Chamber 16/08/2013 07/08/2013 View
3461 A split type high temperature Furnace for Fluidised Bed reactor system 16/08/2013 31/07/2013 View
3505 Purchasing of Printing Stationery for Admn. 16/08/2013 12/08/2013 View
3506 Purchasing of Stationery for Administration 16/08/2013 12/08/2013 View
3468 Purchase of Desktops 14/08/2013 01/08/2013 View